Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

LEC - Laurens Electric Cooperative, Inc

South Carolina Utility Interconnection & net metering rules
Net Metering Allowed0
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
0
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Other
Solar Export Value Notes
$0.08c/kWh in the summer (June-Sept) and $0.05c/kWh in the winter (Oct-May)
Net Excess Generation Notes

For each billing period, the Consumer’s monthly energy generated by Consumer’s Eligible Generation Source for that billing period will be credited by an amount per kilowatt-hour at the Cooperative’s stated rate as outlined in section below. Cooperative shall review the cost of service based rate at least annually to ensure rate reflects the appropriate cost.


As of the Effective Date of this Rider (June 1, 2022), monthly generated energy shall be credited at the Cooperative’s rate of:

  • Summer Months (June through September) @ 8.0¢ per kWh
  • Winter Months (October through May) @ 5.0¢ per kWh 


If the solar credit is larger than the energy bill, the remaining credit rolls over to the next month as long as the account remains active. 

Rebates Offered
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Tap Criteria

Inside the Meter Base:

1. MilBank (k4977-INT or k4977-EXT) Lug on the bottom side of the meter base.

2. Polaris Insulated Splice Connectors.


Inside Main Service Panel: 1. Back Fed Breaker ONLY. 

Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
20
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

The size of the array is checked by me based on the average of the Highest PEAK demand meter readings

If the system is too large we will not approve the application.

To qualify for service under this Rider, the Nameplate Rating of the Consumer’s installed generation system and equipment must not exceed the Consumer’s actual or estimated average (12)-month non-coincidental demand (kW) or 20 kW for a residential consumer or 1,000 kW for a non-residential consumer, whichever is less

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

**If at any time these accepted points of interconnection are requiring a meter base gut change out, meter base upgrade, or upgrade to service at the members home you will need to contact to request a temporary disconnect before the work is done. If the application is NOT in approval to install, we will NOT grant the temporary disconnection until the application is in Approval to install status. Also, once power is temporarily disconnected, we will require a county inspection separate to the solar permit to have service reconnected. For questions, and/or more information, please contact me any time at .

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • All AC disconnects must be on the exterior of the home and within 5 feet of the Utility Meter
  • Call out subfeed lug kit model number or lugs to be existing
SLD Reqs
  • NO insulation Piercing taps whatsoever.
  • LEC requires a breaker for interconnection. If that means you have to upgrade the MSP then that’s what has to be done.
  • All AC disconnects must be on the exterior of the home and within 5 feet of the Utility Meter
Electrical Diagram Notes

All Jobs [The AC Disconnect is within 5 ft of the utility meter]

Website
link
Phone
(800) 942-3141

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
155271
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with LEC - Laurens Electric Cooperative, Inc before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.