Little River Electric
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
"Excess energy not used in the current billing month to reduce billed kilowatt-hour usage shall be
accumulated and used to reduce usage in future months; however, any accumulated excess
energy not used to reduce billed kilowatt-hour usage shall be reset to zero each June Excess
energy delivered prior to June 1 will only be used to reduce usage provided by the Cooperative
prior to June 1"
- Rebates Offered
- 0
- Deregulated
- 1
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
- System Offset Notes
20kw residential max
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
Contact the cooperative directly to schedule a TDR, no fees specified from Rep
- Allowed Meter Adapter
- None
Plans & docs
- Install Reqs
Contact the cooperative directly to schedule a TDR, no fees specified from Rep "The installation of the Distributed Resource and all equipment in the system must comply with the latest published edition of IEEE 929 and IEEE 1547 as applicable. All installed wiring, protection devices, cabinets and connectors, etc. must comply with the latest published edition of the NEC as used by the local jurisdiction and all applicable local codes. An approved electrical
inspection by the authority having jurisdiction is required. Member shall install a manual load-break disconnect switch with a clear visible indication of switch position between Cooperative’s electric system and Member’s Distributed Resource. The Isolation Device shall be installed as specified in the Interconnection Standard."
Utility Inspection Required: Yes
- Placards
"Member will install a permanent warning label in a conspicuous place in close proximity to the electric meter or on the meter base to notify them personnel that there is a generator installed on the load side of the meter. The warning label shall not be placed in a
location that would interfere with the ability of Cooperative personnel to read the electric meter. Member shall also place a warning label on the Isolation Device. Cooperative will provide the warning labels to Member. The warning labels must be in place before the Distributed Resource can be interconnected with Cooperative’s system."
- Equipment Approvals
- California Energy Commission
- Rate Schedule Link
- link
- Website
- link
- Phone
- (800) 459-2141
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 165099
- Express Planset Eligible
- Yes