Net Metering AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Solar Export Value Notes
$.02-$.04
Net Excess Generation Notes

CRG shall first be used for the customer’s own load and shall offset customer’s demand for electricity from the City. Excess CRG that is not used for customer’s load shall be delivered to City’s electric distribution system. Customer shall be charged for electricity delivered to customer by the City in accordance with the otherwise applicable retail rate schedule

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Install Reqs

Customer shall install a manual disconnect switch of the visible load break type to provide a separation point between the AC power output of the CRG system and any Customer wiring connected to Utility’s electric system such that back feed from the CRG system to Utility’s electric system cannot occur when the switch is in the open position. The manual disconnect switch shall be mounted separate from the meter socket on an exterior surface adjacent to the meter. The switch shall be readily accessible to Utility and capable of being locked in the open position with a Utility padlock. When locked and tagged in the open position by Utility, this switch will be under the control of Utility.

Website
link
Phone
(864) 647-3200

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Westminster Utility Commission before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.