Report a correction Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- No
- TOU Utility
- No
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.0481
- Solar Export Value Notes
- May change without prior notice
- Net Excess Generation Notes
All generation from the DG system will be recorded by the installed DG meter, purchased at $0.0481 per kWH and applied as a credit to the following month’s bill.
- Rebates Offered
- No
- Deregulated
- Yes
- Allows Standby
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Bartlett Electric does not allow systems above 20 kW AC
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- Electrical Diagram Notes
Safety Disconnect -- A Renewable DG Producer shall install, at Producer’s expense, inverters with specifications and test standards UL 1741-1999 (or latest version) to provide isolation. In addition, a main disconnect switch will be installed by the Producer to provide a means of disconnection.