Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

CCECA - Cherokee County Electric Cooperative Association

Texas Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Cherokee County Electric offers net metering for arrays <15kW it is a one- to-one exchange rate with a minimum monthly charge of $30.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
15
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Net metering is approved for systems under 15kW.

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

line side tap conductors must end in a breaker or fuses not in mlo lugs in the panel.

Website
link
Phone
(903) 683-2248

Other details

Restrict Inspection
0
Address ID
108151
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with CCECA - Cherokee County Electric Cooperative Association before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.