City of Castroville
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If Customer’s electric installation produces excess electricity, City shall pay Customer for excess electricity at the City’s “avoided cost”. Customer’s excess electricity shall be carried over month to month as a credit; but, Customer shall be paid a refund when service is either discontinued or at the end of the City’s fiscal year. Credits shall not be carried over into another fiscal year or be transferrable.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Website
- link
Other details
- Restrict Inspection
- 0
- Address ID
- 1021790
- Express Planset Eligible
- Yes