City of Flatonia
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
- In a billing month, if the energy delivered by the customers approved system to the utility company exceeds the amount of energy delivered by the utiity to the customer, the city shall credit the customers account for the energy generated. Excess generation credited at 75% of the Fuel Adjustment Rate.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
- System Offset Notes
- Residential up to 10kW
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
- Temporary Disconnect Reconnect Process (TDR) Just call during office hours and someone can request even a few hours before.
TDR - Who to Contact staff
TDR - Applications/Documents Req No
TDR - ETA of notice required for request A few hours during office hours
TDR - Who can schedule? Anyone
TDR - ETA of Utility Scheduling TDR N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- a. Drawings must be dimensioned, with a scale of 1β = 20β and of sufficient clarity b. Documents must be 24β x 36β c. Show street address and legal description of the lot d. Show the property lines, setback lines and lot dimensions e. Indicate βNorthβ f. Show where you plan to take the water, sewer and electrical lines from in the building g. Show footprint of the building and distance from building to property lines h. Indicate location of existing utilities i. Indicate the height of the building connect with existing city utilities j. Indicate what the building or addition will be used for k. Include title block l. Show contour lines m. Indicate grade levels -planned elevations after grading, including drainage n. Show and label proposed structure and all existing buildings o. Indicate any structures to be moved/demolished p. Include sidewalks and driveways q. Show all easements
- SLD Reqs
- See Plans Sample
- Install Reqs
- No requirements other than the AC Disconnect. They don't install a meter.
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (361) 865-9213
Other details
- Restrict Inspection
- 0
- Address ID
- 225372
- Express Planset Eligible
- Yes