City of Giddings
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedNo
NEM TypeN/A
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- No
- NEM Type
- N/A
- TOU Utility
- No
- Post Solar Billing Method
- Non-export
- Solar Export Type
- N/A
- Net Excess Generation Notes
No solar program, energy produced by the customer's solar will be consumed right away. Any exported kWh will not be compensated.
*** System must NOT negatively affect the utility side (doesn't trigger transformer upgrade)
*** Engineering study required for all application and will be invoiced separately from the Application Cost (fee varies per project)
- Rebates Offered
- No
- Allows Standby
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
Plans & docs
- Website
- link
- Phone
- (979) 540-2710
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes