Net Metering AllowedNo
NEM TypeN/A
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
No
NEM Type
N/A
TOU Utility
No
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.05475
Solar Export Value Notes
Export rate changes changes from quarterly or annually
Net Excess Generation Notes

Surplus energy produced by the Customers generation system shall be measured by separate meter or register and shall be purchased by the City at the Distributed Generation Buy Back Rate defined within the City's Ordinances and applicable fee schedule. The City shall apply the total value of energy purchases by the City as a credit against the Customer's monthly service charges. In the event the credit to Customer exceeds the total due to the City for electric service, the energy purchases by the City shall be applied as a Credit to the next monthly billing cycle.

Rebates Offered
No
Deregulated
No
Allows Standby
Yes

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Recommended system size is below 20 kW AC

Project may be flagged as oversize or additional engineering study may be required if one of the following is NOT true:

  • Proposed distributed generation equipment is pre-certified. Generation equipment that is less than 20 kW AC shall be considered pre-certified if a UL1741 listed inverter that also meets IEEE 1547 specifications is used as well as UL 1703 listed photovoltaic (PV) modules.
  • Proposed distributed generation system does not expect to export more than 15 percent of total load on the feeder.
  • Proposed distributed generation system does not contribute more than 25 percent of the maximum possible short circuit current of the feeder.
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Electrical Stamp Required
No
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
Yes
ESID Num Req SLD 3LD
No
Website
link
Phone
(979) 279-3461

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Hearne before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.