City of Hearne
Net Metering Allowed0
NEM TypeN/A
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- N/A
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.05475
- Solar Export Value Notes
- Export rate changes changes from quarterly or annually
- Net Excess Generation Notes
Surplus energy produced by the Customers generation system shall be measured by separate meter or register and shall be purchased by the City at the Distributed Generation Buy Back Rate defined within the City's Ordinances and applicable fee schedule. The City shall apply the total value of energy purchases by the City as a credit against the Customer's monthly service charges. In the event the credit to Customer exceeds the total due to the City for electric service, the energy purchases by the City shall be applied as a Credit to the next monthly billing cycle.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Recommended system size is below 20 kW AC
Project may be flagged as oversize or additional engineering study may be required if one of the following is NOT true:
- Proposed distributed generation equipment is pre-certified. Generation equipment that is less than 20 kW AC shall be considered pre-certified if a UL1741 listed inverter that also meets IEEE 1547 specifications is used as well as UL 1703 listed photovoltaic (PV) modules.
- Proposed distributed generation system does not expect to export more than 15 percent of total load on the feeder.
- Proposed distributed generation system does not contribute more than 25 percent of the maximum possible short circuit current of the feeder.
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 1
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (979) 279-3461
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 1245634
- Express Planset Eligible
- No