Texas Utility Interconnection & net metering rules
NEM TypeAnnual
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

NEM Type
Annual
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Net Excess Generation Notes

(a) The purpose of this section is to set the annual energy rate that the city will reimburse for energy generated by an authorized distributed generation (“DG”) system that is interconnected to the city's electric system and in parallel operation with the city's system and which exports energy to the city. (b) Energy exported by a DG system will be measured monthly by a city electric meter. (c) The city will reimburse customers that export energy to the city's electric system based on the city's annual avoided cost of generation from the previous calendar year. (d) The formula for calculating the annual avoided cost of generation rate (“ACGR”) is as follows: ACGR = Annual generation costs (from monthly wholesale power invoices) for 12 calendar months in a calendar year / total energy purchases in that same period.

Rebates Offered
0
Deregulated
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

The City encourages customers considering the installation and interconnection of DG system to “right-size” these systems. A good rule to consider is to size DG systems at not larger than 30% of the premise (residence or business) peak demand.

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

See SLD Sample

Equipment Approvals
California Energy Commission
Website
link
Phone
(325) 247-4158

Other details

Restrict Inspection
0
Address ID
677049
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Llano before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.