City of Seguin Electric Department

Texas Utility Interconnection & net metering rules
Net Metering Allowed0
NEM TypeN/A
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
NEM Type
N/A
TOU Utility
1
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Net Excess Generation Notes
  1. In a billing month after a Customer receives approval to interconnect the Customer’s onsite generating system from the City of Seguin, the Utility will determine the Delivered KWh and the Received KWh on an ongoing, monthly basis.
  2. The Delivered KWh (energy) will be billed on the standard applicable rate schedule.
  3. The Received KWh (energy) will be multiplied by the City of Seguin Avoided Cost of Generation for the applicable billing cycle to determine the amount the Utility shall credit the Customer.
  4. The Avoided Cost of Generation is based on the actual cost of power supply from the City of Seguin wholesale supplier(s). The City of Seguin shall credit the Customer’s account for this amount.
  5. Any credit related to the Avoided Cost of Generation shall remitted by the City of Seguin to the Customer in a reasonable time period.
Rebates Offered
0
Deregulated
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
Production Meter Labeling
Bi-Directional Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

SLD Reqs


Electrical Stamp Required
0
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(830) 401-2460

Other details

Restrict Inspection
0
Address ID
789104
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Seguin Electric Department before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.