Report a correction Net Metering AllowedNo
NEM TypeN/A
Supply Side Taps AllowedYes
Line Taps AllowedYes
Load Taps AllowedYes
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- No
- NEM Type
- N/A
- TOU Utility
- Yes
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Value Notes
- Changes monthly
- Net Excess Generation Notes
CoServ will buy back all received energy from the Member's solar system at our avoided wholesale power cost, and Member's purchasing all delivered energy from CoServ at the applicable retail rate. The buyback of received energy will occur in the form of a credit applied to each bill.
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Supply Side Taps Allowed
- Yes
- Line Taps Allowed
- Yes
- Load Taps Allowed
- Yes
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- Tesla Backup Switch
Plans & docs
- Site Plan Reqs
- DG plans need to be NABCEP stamped
- AC disconnect must be accessible at all times by the utility
- AC disconnect must be on an exterior wall and within ten feet of the CoServ meter. Other locations must be approved by the utility and may result in longer project timelines
- SLD Reqs
- The SLD required to be stamped by a Professional Engineer registered in the state of Texas
- As of 05/01/2021, Coserv no longer requires PV meters to be installed
- Line side tap conductors must end in a breaker or fuses not in mlo lugs in the panel.
- Install Reqs
- Placards
- If the AC disconnect is more than 10 ft from the CoServ meter, place a site directory placard on the meter or nearby customer equipment showing its location.
- Electrical Stamp Required
- Yes
- Meter Num Req SLD 3LD
- Yes
- ESID Num Req SLD 3LD
- No
- Website
- link
- Phone
- 940-321-7800