Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

FELPS - Floresville Electric Light & Power System

Texas Utility Interconnection & net metering rules
Net Metering Allowed1
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
TOU Utility
1
Post Solar Billing Method
Net Metering
Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Tap Criteria

Lineside interconnection is not allowed, it has to be on the load side on a dedicated breaker (Piecing tap not allowed).

Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
50
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

UP to 50kW

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

SLD Reqs
  • Meter Socket (required)
  • PV > INV > Disco > PM > MSP
  • No interior sub POI allowed
  • If POI is on the FELP pole (W/ transformer), PV Equipment required to be installed on rack 6ft away.
  • If it's on the customer-owned pole, can attach to the pole.
Electric Service Reqs

Note- 1: The customer shall provide and install a manual load break switch that provides a clear indication of the switch position at the Point of Interconnection to provide separation between the FELPS electrical system and the customer's electrical generation system. The connections shall be labeled FELPS and Solar both inside and outside of the box identifying where the connection comes from. The location of the disconnect switch must be approved by FELPS. The disconnect switch shall be easily visible, mounted separately from metering equipment, readily accessible to FELPS personnel at all times, and capable of being locked in the open position with a FELPS padlock.


Note-2: The location of the fused disconnect or breaker boxes must be approved by FELPS. The disconnect or breaker boxes shall be easily visible, readily accessible to FELPS personnel at all times, and capable of being locked open in a way that would protect FELPS personnel from accidental closing and re-energizing of the system while work is being done by FELPS personnel in the area.

Website
link
Phone
(830) 216-7000

Other details

Restrict Inspection
0
Address ID
127420
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with FELPS - Floresville Electric Light & Power System before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.