Fort Belknap Electric Cooperative Inc

Texas Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.049
Net Excess Generation Notes

For energy produced in excess of instantaneous on-site requirements, the customer shall be compensated at the Coop's avoided cost. Avoided cost changes monthly (currently at $0.049 / kWh). The bill credit will roll over to the following month, after Dec 31 any remaining bill credit will reset to zero

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes


Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Labeling
Utility Disconnect Switch
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

line side tap conductors must end in a breaker or fuses not in mlo lugs in the panel.

Website
www.fortbelknapec.com
Phone
(940) 564-3526

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
0
Address ID
121059
Express Planset Eligible
Yes