Greenville Electric Utility System

Texas Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
Line Taps AllowedYes
Load Taps AllowedYes
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
No
TOU Utility
No
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.04
Solar Export Value Notes
Varies monthly
Net Excess Generation Notes

The monthly credit, if any, is calculated as follows: Each kWh delivered from the customer’s approved system to GEUS’ electric system is multiplied by the Fuel Adjustment Charge (FAC). The "kWh delivered" is defined as the energy (kWh) exported back to the grid when the customer produced more than what they consumed at that given time.

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
Yes
Load Taps Allowed
Yes
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Up to 25 kW AC system as long as the project does NOT trigger any transformer upgrade

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Website
link
Phone
(903) 457-2800

Other details

Revision Required
No