HILCO Electric Cooperative
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
HILCO does net meter within a billing cycle. What that means is we do not pay for any over production or buyback of energy, but we do allow your extra generation to collect over the monthly billing period and any extra energy you produce can be used within the billing period.
- Rebates Offered
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 1
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
However, please ensure that the system is sized as close as possible as to 100% offset. The utility will not purchase/credit any excess generation.
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Projects 25kW and up require structural stamps and engineering.
- SLD Reqs
line side tap conductors must end in a breaker or fuses not in mlo lugs in the panel.
- Rate Schedule Link
- link
- Website
- link
- Phone
- (254) 687-2331
Other details
- Restrict Inspection
- 0
- Address ID
- 108104
- Express Planset Eligible
- Yes