Kerrville Public Utility Board

Texas Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed1

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.0406
Net Excess Generation Notes

Company shall pay the customer for all energy received

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Install Reqs

For utility disconnect

- ask for dispatch and state needing to schedule a temp disconnect to tie in solar installation.

They recommend calling in advance a few days as the schedule fills up fast.

If within city limits it will require a city meter release inspection to reconnect power.

Rate Schedule Link
link
Website
link
Phone
(830) 257-3050

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
1
Address ID
227547
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Kerrville Public Utility Board before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.