Lea County Electric Cooperative Inc (TX)

Texas Utility Interconnection & net metering rules
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Rebates Offered
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs
line side tap conductors must end in a breaker or fuses not in mlo lugs in the panel.
Website
www.lcecnet.com
Phone
(575) 396-3631

Other details

Restrict Inspection
0
Address ID
121086
Express Planset Eligible
Yes