Taylor Electric Cooperative
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
No credits for Net Excess Generation.
Members will be compensated at the cooperative’s full retail rate for energy returned to the grid up until all of the member’s usage each month has been offset. Any generation in excess of the member’s monthly usage during any billing period shall not be compensated.
Any power generated by your system which is in excess of your monthly usage will be returned to the electric grid and cannot be carried forward from month to month.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Customer to call to the utility upfront to schedule a "Solar Audit" with the utility, they'll then determine the approved system size. The approved system size may not be 100% offset as they use their own offset calculation, so it's imperative that the customer take care of does upfront.
- Offset Calc Tool
- Utility Tool
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
A manual disconnect device that has a visual break that is appropriate to the voltage level (a disconnect switch, a draw-out breaker, or fuse block), and is accessible to the Cooperative personnel, and capable of being locked in the open position by a cooperative padlock
Line side tap conductors must end in a breaker or fuses not in mlo lugs in the panel.
Disconnect can not be locate in interior.
- Install Reqs
Facilities Rated 15 kW or Less
Must have an interconnect disconnect device, a generator disconnect device, an over-voltage trip, an under-voltage trip, an over/under frequency trip, and a manual or automatic synchronizing check (for facilities with stand-alone capability).
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (325) 793-8500
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Address ID
- 109851
- Express Planset Eligible
- Yes