City of Ephraim
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If the electricity generated by the Customer’s System exceeds the Customer’s consumption, and the Customer’s excess electricity is distributed back to the City during the billing period, then the Customer shall still be billed for the customer service charge(s) paid by other customers of the City in the same rate class as Customer, however, Customer shall be credited for the net excess kilowatt-hours generated during the billing period at a wholesale rate set forth in the City’s fee schedule, which may be amended from time to time at the sole discretion of the City. Any credit earned by the Customer shall appear on Customer’s bill for the following billing period. On April 30th of each calendar year, any remaining unused kilowatt-hour credit accumulated during the previous year shall be granted to the City without any compensation to Customer.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 5
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Maximum 5 kW for residential; 15 kW for commercial
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (435) 283-4631
Other details
- Restrict Inspection
- 0
- Address ID
- 1022013
- Express Planset Eligible
- Yes