City of Hurricane (UT)
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.04
- Net Excess Generation Notes
Hurricane City Power will purchase any energy the customer delivered to the City’s power grid during that billing cycle. The rate at which Hurricane will purchase the energy is $0.04/kwh and is part of the Hurricane City Power Rate Schedule.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Recommended max: 8.1 kW DC / 6 kW AC
Installations of up to 16 KW DC /12 KW of AC output with a 6 KW limiter will be considered by Hurricane City Power Staff on a case-by-case basis. Installations with battery storage are allowed without size limitation. An installation with battery storage shall not export more than 6 KW. $0.00 export rate for battery projects
System over 8.1 kW DC/6 kW AC will require additional Interconnection study, cost will vary depending on the size, customer location, transformer/pole existing load and etc.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Website
- link
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Address ID
- 1175146
- Express Planset Eligible
- Yes