Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Garkane Energy

Utah Utility Interconnection & net metering rules
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1

Net metering & export

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Offset Calc Tool
Utility Tool

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Precise physical location of the proposed Small Generating Facility

Topographic map or other diagram or documentation

SLD Reqs

Configuration of all Small Generating Facility equipment

Current and potential circuits

Protection and control schemes

Electric Service Reqs

Stand-alone meters must receive an MPU in Utah

AC Disconnect

“Visible Disconnect Switch” per NESC requirements, which can be padlocked in the OPEN position and is accessible to Garkane personnel at all times.

Disconnect must be permanently and visibly marked as “GENERATOR DISCONNECT” in letter at least 2” high

Taps:

Load Side Taps Allowed

Line Side Tap Acceptable if we install a visible disconnect

Supply Side Taps NOT Allowed

Placards

AC Disconnect

Must be permanently and visibly marked as “GENERATOR DISCONNECT” in letter at least 2” high.

Website
link
Phone
(435) 644-5026

Other details

Restrict Inspection
0
Address ID
108110
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Garkane Energy before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.