Logan City - Department of Light and Power
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- N/A
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.098
- Solar Export Value Notes
- 2022: $0.098/kWh (see excess generation note for more info)
- Net Excess Generation Notes
Excess generation is defined as the electricity exported to the Grid when energy generated at that given time was not used in the property/house.
When the customer’s distributed generation delivers excess generated power to the City’s electrical grid, the City will credit the Customer for the excess according to the rates set forth in the City’s “Distributed Generation Energy Metering Rate, Schedule 10”.
Total Installed Residential Solar (as of December 2021): 1644.7 kW
Currently at Step 1 Schedule.
Excess Energy Purchase Schedule:
Step 1: Up to 2500 kW installed: $0.098 (weighted average retail rate)
Step 2: 2500 kW installed: Weighted average wholesale cost + $0.035
Step 3: 3000 kW installed: Weighted average wholesale cost + $0.025
Step 4: 3500+ kW installed: Weighted average wholesale cost + $0.015
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
AC Disconnect Location
- Should be within 3 ft and in sight of the utility meter.
- Other locations require Logan City Light & Power approval.
- SLD Reqs
- This document must indicate the location of the solar electric modules, inverter, batteries (if any), lockable disconnect switch, and point of connection with the utility system.
- All electrical equipment specifications and calculations must be shown on the one-line. Any signs/labels should be shown with their respective calculated values on the one-line.
- The installation address, current account number at that address, and the installer's name and telephone number must also be included.
- For a 6000 Inverter please use a 40A 2P Breaker. There is a shortage of 35A Breakers
- Install Reqs
- Electrical Stamp Required
- 0
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Label Page Notes
- Reference Utah Labels block
- Rate Schedule Link
- link
- Website
- link
- Phone
- (435) 716-9000
Other details
- Restrict Inspection
- 0
- Address ID
- 108122
- Express Planset Eligible
- Yes