Supply Side Taps AllowedYes
Line Taps AllowedYes
Load Taps AllowedYes

Net metering & export

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
Yes
Line Taps Allowed
Yes
Load Taps Allowed
Yes
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Percentage
Offset Value
120
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
No specific requirements, MLED would rather see equipment specs than Site Plan
SLD Reqs
PV Panels -> Inverter -> Disconnect -> MSP -> MLED Meter
No specific requirements, MLED would rather see equipment specs than One Line
Line and Load Side Taps Allowed
Supply-Side Taps NOT Allowed
AC Disconnect:
Customer must provide a visible Isolation Switch for the Customer-owned Generation System that meets applicable ANSI For a 6000 Inverter please use a 40A 2P Breaker. There is a shortage of 35A Breakers - 11.23.20
Electric Service Reqs
Moon Lake does not have an offset restriction where they will decline or system offset, but for Net Metering, they do limit the production to 120%
Net Metering Program shall be available to Cooperatives Customers until the combination of all Customer-owned Generation Systems under the Net Metering Program will exceed 120 kW or until Cooperative limits interconnections to a prescribed amount of kW in excess of 120 kW.**Taps:**
Placards
AC Disconnect:
Isolation Switch must be permanently and visibly marked as GENERATOR ISOLATION in letters at least 2" high.
If the Isolation Switch is not adjacent to the electrical service entrance equipment, a permanent/weather resistant map shall be installed at that location detailing where the Isolation Switch is located.