Murray City Power
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The Customer’s account shall be credited for the net excess kilowatt-hours generated during the billing period, with this kWh credit appearing on Customer’s bill for the following billing period. Credits on the Customer’s
account may only be applied toward kilowatt-hour usage, not toward customer service charges. The Customer further agrees that any and all of the kilowatt-hour electric energy credit(s) remaining on the account at the time of the Customer’s April billing each year shall be set to zero, without further liability to the City.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
- System Offset Notes
100% offset or 10 kW DC max for Residential (whichever is LESS)
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- AC Disconnect Required
- Yes
- Meter Spot Process
Temporary Disconnect Reconnect Process (TDR) No requirements just call a day or two ahead of time.
TDR - Who to Contact staff
TDR - Applications/Documents Req No
TDR - ETA of notice required for request 48 hours
TDR - Who can schedule? Does not matter
TDR - ETA of Utility Scheduling TDR N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
Must include all equipment necessary to meet applicable safety, power quality, and interconnection requirements established by the latest revisions of NEC, IEEE, UL, and any applicable local and state agencies.
- Install Reqs
"The City will install and maintain a revenue meter capable of registering the bi-directional flow of electricity at
the Customer's premises at a level of accuracy that meets all applicable standards, regulations
and statutes (Customer may, at its option, pay the additional costs for the City to install a dual registering
meter capable of separately measuring and recording both delivered and received
kilowatt-hours). Any meters installed on the Customer’s premises shall remain the property of the City."
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Label Page Notes
Reference Utah Labels block
- Website
- link
Other details
- Restrict Inspection
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 287173
- Express Planset Eligible
- No