Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Washington City Power (UT)

Utah Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.04
Solar Export Value Notes
Export rate may change as needed
Net Excess Generation Notes

For all kWh received from the Customer to the City, the City shall credit the Customer's current electric bill during the current billing period at the wholesale rate of 4 cents / kWh

If the credit amount ($) exceeds the electrical charges due, a credit will be applied on the next month's billing. At the discretion of the City, a check may be issued to the Customer in lieu of a credit amount.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
120
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Offset Calc Tool
Utility Tool

Metering & disconnect

Production Meter Required
Yes
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Site Plan is not required to be submitted for utility submittal

AC Disconnect:

Required to be within 5 feet of the meter location, readily accessible by City personnel and outside of any fenced-in area.

SLD Reqs

A Disconnect is required that is within 5' of the meter location, readily accessible and outside of any fenced area. The disconnect switch shall be lockable and shall be labeled, "Generation Disconnect".


PM is required adjacent to the manual Disconnect.

Electric Service Reqs

Utility will calculate production overages by comparing to the customer's last 12 months of consecutive usage.

The city shall make Net Metering available to eligible customers on a first-come, first-served basis. Single or multiple Net Metering connections to a City-owned transformer, which create an imbalance that exceeds 20% of the nameplate rating may be denied at the City's discretion or, if approved may require system upgrades including additional transformers or other system upgrades at the Customer's expense

Rate Schedule Link
link
Website
link
Phone
(435) 656-6300

Other details

Restrict Inspection
0
Address ID
108121
Express Planset Eligible
No