Bristol Virginia Utilities
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Post Solar Billing Method
- Feed-in-Tariff
- Solar Export Type
- Other
- Solar Export Value Notes
- Non-Export
- Net Excess Generation Notes
Energy offset only/Non-Export. The customer may choose to enter an agreement with the Tennessee Valley Authority (TVA) for other payment options such as excess generation credits or buy-all sell-all options. The customer must initiate this request with the TVA
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- The capacity of any generating facility installed under this section after July 1, 2020, shall not exceed 100 percent of the expected annual energy consumption based on the previous 12 months of billing history or an annualized calculation of billing history if 12 months of billing history is not available, and in the certificated service territory of a Phase II Utility, the capacity of any generating facility installed under this section after July 1, 2020, shall not exceed 150 percent of the expected annual energy consumption based on the previous 12 months of billing history or an annualized calculation of billing history if 12 months of billing history is not available.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
Plans & docs
- Site Plan Reqs
- Major equipment must be shown/labeled (generators, transformers, inverters, circuit breakers, protective relays, batteries, number and location of PV panels, etc.)
- SLD Reqs
- Major equipment must be shown/labeled (generators, transformers, inverters, circuit breakers, protective relays, batteries, number and location of PV panels, etc.)
- Website
- link
- Phone
- (276) 669-4112
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 1491325
- Express Planset Eligible
- Yes