City of Danville Utilities (VA)

Virginia Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
TOU Utility
No
Post Solar Billing Method
Net Metering
Solar Export Type
Other
Net Excess Generation Notes

For a net metering customer, in any billing period in which there is a billing period credit, the customer shall be required to pay only the non-usage sensitive charges for that billing period. Any billing period credits shall be accumulated, carried forward, and applied at the first opportunity to any billing periods having positive net consumptions. However,

any accumulated billing period credits remaining unused at the end of a net metering period shall be carried forward into the next net metering period only to the extent that such accumulated billing period credits carried forward do not exceed the net metering customer's billed consumption for the current net metering period, adjusted to exclude accumulated billing period credits carried forward and applied from the previous net metering period.

Rebates Offered
Yes
Allows Standby
Yes

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

SLD Reqs


Install Reqs

Accessible Lockable disconnect 

Equipment Approvals
California Energy Commission
Electrical Diagram Notes


Website
link
Phone
(434) 799-5268
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Danville Utilities (VA) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.