City of Danville Utilities (VA)
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Other
- Net Excess Generation Notes
For a net metering customer, in any billing period in which there is a billing period credit, the customer shall be required to pay only the non-usage sensitive charges for that billing period. Any billing period credits shall be accumulated, carried forward, and applied at the first opportunity to any billing periods having positive net consumptions. However,
any accumulated billing period credits remaining unused at the end of a net metering period shall be carried forward into the next net metering period only to the extent that such accumulated billing period credits carried forward do not exceed the net metering customer's billed consumption for the current net metering period, adjusted to exclude accumulated billing period credits carried forward and applied from the previous net metering period.
- Rebates Offered
- 1
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
Plans & docs
- SLD Reqs
- Install Reqs
Accessible Lockable disconnect
- Equipment Approvals
- California Energy Commission
- Electrical Diagram Notes
- Website
- link
- Phone
- (434) 799-5268
Other details
- Restrict Inspection
- 1
- Address ID
- 964507
- Express Planset Eligible
- Yes