NOVEC - Northern Virginia Electric Coop

Virginia Utility Interconnection & net metering rules
Net Metering Allowed1
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

When a solar array is generating more electricity than a home requires during that point in time, the excess energy will flow through the home and onto the utility grid to help power other homes in your neighborhood. The power produced will be counted by the solar meter on the side of your home.You will receive a credit from your utility company for every kilowatt hour (kWh) of electricity that you provide to the grid. This system is referred to as netmetering. Your utility credits will rollover from month to month until they are used

Rebates Offered
1
Deregulated
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
2
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
20
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Utility Specific Adjustments
  • AC sizing must not be larger than the DC and cannot exceed 20kw. Ticket #2945647 (Utility Correction)


Utility will not allow over 100% offset from past 12 month usage. https://pvwatts.nrel.gov/ is required.

System Offset Notes


Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Meter Spot Process

Temporary Disconnect Reconnect Process (TDR)

  • Schedule during regular hours, no fees.
  • TDR - Who to
  • TDR - Applications/Documents Req N/A
  • TDR - ETA of notice required for request 48 hours
  • TDR - Who can schedule? Does not matter
  • TDR - ETA of Utility Scheduling TDR N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • Present location of the meter and the proposed location of the disconnect for the solar would also be helpful.
Install Reqs
  • A certified electrician will need to install a disconnect to isolate the solar or wind systems at the meter between the meter base and the consumers panel on the outside of the home next to the meter where the utility can have access to it. It will need to be labeled.
  • Both the disconnect and solar box must remain off and are not permitted to be turned on until the PTO is received.
Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Electrical Diagram Notes

#NFZ_ALL#

Website
link
Phone
(703) 392-1607

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
1
Address ID
629680
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with NOVEC - Northern Virginia Electric Coop before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.