NOVEC - Northern Virginia Electric Coop
Net Metering Allowed1
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
When a solar array is generating more electricity than a home requires during that point in time, the excess energy will flow through the home and onto the utility grid to help power other homes in your neighborhood. The power produced will be counted by the solar meter on the side of your home.You will receive a credit from your utility company for every kilowatt hour (kWh) of electricity that you provide to the grid. This system is referred to as netmetering. Your utility credits will rollover from month to month until they are used
- Rebates Offered
- 1
- Deregulated
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 2
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
- AC sizing must not be larger than the DC and cannot exceed 20kw. Ticket #2945647 (Utility Correction)
Utility will not allow over 100% offset from past 12 month usage. https://pvwatts.nrel.gov/ is required.
- System Offset Notes
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Process
Temporary Disconnect Reconnect Process (TDR)
- Schedule during regular hours, no fees.
- TDR - Who to
- TDR - Applications/Documents Req N/A
- TDR - ETA of notice required for request 48 hours
- TDR - Who can schedule? Does not matter
- TDR - ETA of Utility Scheduling TDR N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- Present location of the meter and the proposed location of the disconnect for the solar would also be helpful.
- Install Reqs
- A certified electrician will need to install a disconnect to isolate the solar or wind systems at the meter between the meter base and the consumers panel on the outside of the home next to the meter where the utility can have access to it. It will need to be labeled.
- Both the disconnect and solar box must remain off and are not permitted to be turned on until the PTO is received.
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Electrical Diagram Notes
#NFZ_ALL#
- Website
- link
- Phone
- (703) 392-1607
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 629680
- Express Planset Eligible
- Yes