Jacksonville Electric
Net Metering Allowed0
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.15561
- Net Excess Generation Notes
Projects whose completed application was filed on or after January 1, 2017 are not eligible for the Solar Net Metering Credit.
The blended residential rate is the rate multiplied by excess generation kWh and applied as an additional credit on the customer’s bill.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- ConnectDER
Plans & docs
- Site Plan Reqs
- A utility-accessible, lockable, visible, load-break disconnect switch at the Point of Interconnection is required
- Production meter required
- SLD Reqs
- AC disconnect required
- Production meter required
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (802) 368-7010
Other details
- Restrict Inspection
- 0
- Address ID
- 219621
- Express Planset Eligible
- No