Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Brodhead Water & Light

Wisconsin Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The customer shall be billed monthly on a net energy basis and shall pay the fixed charge and energy charge specified in the rate schedule under which he is served. If, in any month, the customer’s bill has a credit balance of $25 or less, the amount shall be credited to subsequent bills until a debit balance is reestablished. If the credit balance is more than $25, the utility shall reimburse the customer by check upon request. Monthly credits shall be computed by taking the net excess kilowatt-hours produced times the sum of the applicable energy charge plus monthly power cost adjustment clause (PCAC).

Rebates Offered
1
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

"Excess generation by DG installations less than 20 kW in size is purchased according to the Pgs-1 tariff (attached.)


Excess generation by DG installations greater than 20 kW in size is purchased according to the Pgs-2 tariff (attached.)"

Offset Calc Tool
PV Watts

Metering & disconnect

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

"Site Plan showing major equipment, electric service entrance, electric meter(s), location of distributed generation and interface equipment, protection equipment, location of disconnect switch, adjoining street name, and street address of the distributed generation system.


• System capacity must be 0.5 kWDC or greater.


• System must be installed within 90 degrees of due south. (Azimuth)


• Must be installed with a panel tilt between 10-50 degrees.


• Must have less than 10 percent obstacle shading based on analysis of an industry-accepted tool."

SLD Reqs

"One-line Schematic Diagram of the System that includes the distributed generation equipment, interconnection disconnect switch (if required),

point of interconnection, meter(s), protection equipment and associated instrumentations"

Electric Service Reqs

"Any PV installation directly or indirectly connected to the utility distribution network has the potential to send power back on to the grid. The utility is required by the Wisconsin Public Service Commission to purchase any excess generation and so all connected distributed generation is required to be metered according to the WI PSC


There is not a separate PV production meter. A bi-directional meter will be installed by the utility.


Installing a bi-directional meter for grid-connected DG applications is a standard practice."

Install Reqs

An outside AC disconnect that is always accessible to the utility 24/7/365 is required as a safety precaution.

Website
link
Phone
(608) 897-2505

Other details

Restrict Inspection
0
Address ID
167217
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Brodhead Water & Light before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.