Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Jackson Electric Cooperative

Wisconsin Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Systems 20 kW and less will be net metered monthly where the production will offset the consumption and any excess production will be banked to the next month. The true up month is June usage. Any excess production at that time will be paid at Dairyland Power's average wholesale avoided cost.

Rebates Offered
0

Interconnection & taps

Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Other details

Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Jackson Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.