Lake Mills Light & Water
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The customer shall be billed monthly on a net energy basis and shall pay the fixed charge and energy charge specified in the rate schedule under which he is served. If, in any month, the customer’s bill has a credit balance of $25 or less, the amount shall be credited to subsequent bills until a debit balance is reestablished. If the credit balance is more than $25, the utility shall reimburse the customer by check upon request. Monthly credits shall be computed by taking the net excess kilowatt-hours produced times the sum of the applicable energy charge plus monthly power cost adjustment clause (PCAC).
A customer who is served under a regular rate schedule shall have any ratchet and/or other device removed from his meter to allow reverse power flow and measurement of net energy used. Customers eligible for net energy billing but with existing metering facilities equipped with ratchets or other devices preventing reverse registration (i.e. time-of-use metering facilities) may request that the utility install the necessary metering to permit such billing.
- Rebates Offered
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
Any PV installation directly or indirectly connected to the utility distribution network has the potential to send power back on to the grid. The utility is required by the Wisconsin Public Service Commission to purchase any excess generation and so all connected distributed generation is required to be metered according to the WI PSC
There is not a separate PV production meter. A bi-directional meter will be installed by the utility.
Installing a bi-directional meter for grid-connected DG applications is a standard practice.
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
• System capacity must be 0.5 kWDC or greater.
• System must be installed within 90 degrees of due south. (Azimuth)
• Must be installed with a panel tilt between 10-50 degrees.
• Must have less than 10 percent obstacle shading based on analysis of an industry-accepted tool.
- SLD Reqs
No line-side taps in the homeowner's MSP
No load-side of the utility meter enclosure in the utility meter base
- Install Reqs
An outside AC disconnect that is always accessible to the utility 24/7/365 is required as a safety precaution.
- Website
- link
- Phone
- (920) 648-4026
Other details
- Restrict Inspection
- 0
- Address ID
- 167818
- Express Planset Eligible
- Yes