WE Energies
Net Metering Allowed1
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 1
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Tap Criteria
Any Line Side Tap must Note "DUAL SOURCE" above Utility Meter.
Note: Dual Gang meter taps no longer required in WE Energies
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
PV Meter no longer required.
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Labeling
- N/A
Plans & docs
- Site Plan Reqs
- Disconnect must be on same building as utility meter.
- Call out Utility Meter, MSP, Fused AC Disconnect and Inverter.
- Legend labels alone are insufficient.
- Show street name.
- If a project includes PV Solar AND a Tesla Powerwall, the project's DC size will be the sum of panels and Tesla Powerwall. For example, if panels put out 4.5kW and a Tesla Powerwall puts out 5kW, the DC size on the SITE PLAN and LINE DIAGRAM should be 9.5kW.
- SLD Reqs
UTILIZE CHECKLIST FOR ALL PROJECTS ---> CHECKLIST
example project----> EXAMPLE
ALL REVISIONS ON TLD NEED TO BE HIGHLIGHTED IN YELLOW
Battery
- UTILIZE LINE DIAGRAM 3 FROM THE FILES SECTION
- If a project includes PV Solar AND a Tesla Powerwall, the project's DC size will be the sum of panels and Tesla Powerwall. For example, if panels put out 4.5kW and a Tesla Powerwall puts out 5kW, the DC size on the SITE PLAN and LINE DIAGRAM should be 9.5kW.
- If Multiple Inverters, circuit into exterior Gen panel with battery backfeeds and feed into one Check Meter then into Gateway Gen Lugs.
- Electric Service Reqs
- Install Reqs
- Placards
- Equipment Approvals
- Other
- Electrical Diagram Notes
All Jobs [The external disconnect shall provide a visible open between its contacts, have the ability to be locked in the open position and have 24/7 ready access for utility workers // CGS-NM rate // METER TO BE LABELED DUAL-SOURCE]
PV ONLY ADD NOTE -----> WE ENERGIES ONE LINE DIAGRAM B1
BATTERY UNDER GROUND ADD NOTE ---> WE ENERGIES ONE LINE DIAGRAM U3
BATTERY OVERHEAD ADD NOTE ---> WE ENERGIES ONE LINE DIAGRAM O3
- Website
- link
- Phone
- (800) 242-9137
Other details
- Restrict Inspection
- 1
- Revision Required
- 1
- Address ID
- 163732
- Express Planset Eligible
- No