WPS - Wisconsin Public Service

Wisconsin Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Flow of energy from the customer's renewable generation facilities into the electrical system of the company shall be permitted, with the meter of the company running backward. If the amount of energy supplied to the company exceeds the amount of energy consumed, customer will receive a credit on their monthly bill for the net excess kilowatt-hours of energy received by the company in the applicable month. A customer’s excess generation will be credited with a weighted average Pg-2A rate using 45% on-peak Pg 2A $/kWh rate and 55% off-peak Pg-2A $/kWh rate. A transmission credit rate of $0.00831/kWh will also be applied to all excess generation. Customer shall retain all renewable credits and other attributes associated with the energy sold to the Company pursuant to this tariff.

Rebates Offered
1
Deregulated
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
1
Load Taps Allowed
1
Tap Criteria
  • Must show that the connectors and first disconnect after the connectors are rated for 22K fault current amps
  • If not using a tap box remove the note on the SLD that is a part of the LST block in the template stating that the tap may be made in a tap box
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

Systems are sized in DC

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • The location of the interconnection disconnect switch (If the disconnecting device is not within 10 feet of the electric metering location, a permanent label describing the location of the disconnect shall be installed on the electric meter socket/pedestal)
  • Adjoining street name
  • The street address of the DG facility
  • For Category 2, 3, or 4 DG facilities, the site plan shall show the location of major equipment, electric service entrance, electric meter, interconnection disconnect switch, and interface equipment.
  • System must be installed within 90 degrees of due south. (Azimuth)
  • Must be installed with a panel tilt between 10-50 degrees.
  • Must have less than 10 percent obstacle shading based on analysis of an industry-accepted tool.
SLD Reqs

LST cannot be in meter can


ANSI symbols shall be used in the one-line schematic diagram to show the following:

  • Generator or inverter.
  • Point where the DG facility is electrically connected to the customer’s electrical system.
  • Point of common coupling.
  • Lockable interconnection disconnect switch.
  • Method of grounding, including generator and transformer ground connections.


  • Based on the interconnection diagrams, behind the meter connections are permitted in the Utility meter or main panel. No parallel meter required like WE Energies
Electric Service Reqs

Interconnection Standards, please review page 14-19

Install Reqs

Interconnection Standards, please review page 14-18

Utility Inspection Required: Yes

Placards

The applicant shall label the interconnection disconnect switch, “Interconnection Disconnect Switch”, by means of a permanently attached sign with clearly visible and permanent letters. The applicant shall provide and post its procedure for disconnecting the DG facility next to the switch.

Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Electrical Diagram Notes

LST [Connectors and disconnect shall be rated for 22K fault current amps] 

Website
link
Phone
(800) 450-7260

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
163799
Express Planset Eligible
Yes